Industrial Water Treatment | Qatar
Water Treatment Plant 2.3
Full EPC delivery and O&M of an industrial water treatment plant in Qatar, handed over in 2021.
Water Treatment Plant 2.3 is one of five industrial water treatment plants we delivered in Qatar. Delivered with a pre-engineered steel weather-protection shelter, the plant treated groundwater drainage to discharge standard and was operated under full O&M through to handover in 2021.
Project scope (EPC)
- Engineering & design of the treatment process and the supporting civil and structural works.
- Procurement & construction of the plant together with a pre-engineered steel weather-protection building.
- Commissioning and performance verification against the treated-water specification.
- Operations & maintenance with on-site staffing, laboratory testing, consumables, sludge removal, and power generation through to handover.
Design & process
The plant treats groundwater drainage from a dewatering process, reducing the pollutant load before controlled discharge. It is designed for a hydraulic load of up to 6,000 m³/day (70 l/s). Designed for an inlet load of up to TSS 1,000 mg/l, the treatment train delivers a treated-water specification of TSS ≤10 mg/l, oil & grease ≤0.5 mg/l, BOD₅ ≤10 mg/l, COD ≤20 mg/l, E. coli ≤2.3 MPN/100 ml, and pH held between 6.5 and 7.5.
Technologies deployed
- Coagulation and flocculation using Polyaluminium Chloride and polymer dosing
- Sedimentation and clarification
- Multimedia / sand filtration
- Activated carbon adsorption
- Manganese and iron (Mn/Fe) reduction
- Sludge thickening and removal
- Independent diesel power generation with standby redundancy
- Pre-engineered steel weather-protection building (multi-span, designed to international steel codes)
Construction & commissioning timeline
- Delivered as part of the second-cluster plants alongside Plant 2.2.
- Construction and installation of a pre-engineered steel weather-protection shelter (October–November 2020).
- Continuous O&M maintained through to project handover in 2021.
Quality & HSE
Delivery was governed by our QA/QC approach — inspection, testing, and documentation against the treated-water specification — and by HSE management covering site safety, environmental control, and regulatory compliance. Laboratory testing and monthly operating reports tracked performance throughout the operations period.
Engineering challenges solved
- Protecting sensitive process equipment from the climate with a purpose-built steel shelter.
- Holding the treated-water specification against a variable inlet load through controlled coagulant and polymer dosing.
- Maintaining power availability on independent diesel generation across the cluster.
- Coordinating structural fabrication and installation alongside ongoing plant operation.
Operations and maintenance were provided by SGS through to handover in 2021. The plant is no longer under our O&M; the experience, systems, and standards demonstrated here are directly transferable to our solar PV and civil infrastructure delivery.