Industrial water treatment plant 2.3

Industrial Water Treatment | Qatar

Water Treatment Plant 2.3

Full EPC delivery and O&M of an industrial water treatment plant in Qatar, handed over in 2021.

Back to Projects

Water Treatment Plant 2.3 is one of five industrial water treatment plants we delivered in Qatar. Delivered with a pre-engineered steel weather-protection shelter, the plant treated groundwater drainage to discharge standard and was operated under full O&M through to handover in 2021.

Project scope (EPC)

  • Engineering & design of the treatment process and the supporting civil and structural works.
  • Procurement & construction of the plant together with a pre-engineered steel weather-protection building.
  • Commissioning and performance verification against the treated-water specification.
  • Operations & maintenance with on-site staffing, laboratory testing, consumables, sludge removal, and power generation through to handover.

Design & process

The plant treats groundwater drainage from a dewatering process, reducing the pollutant load before controlled discharge. It is designed for a hydraulic load of up to 6,000 m³/day (70 l/s). Designed for an inlet load of up to TSS 1,000 mg/l, the treatment train delivers a treated-water specification of TSS ≤10 mg/l, oil & grease ≤0.5 mg/l, BOD₅ ≤10 mg/l, COD ≤20 mg/l, E. coli ≤2.3 MPN/100 ml, and pH held between 6.5 and 7.5.

Technologies deployed

  • Coagulation and flocculation using Polyaluminium Chloride and polymer dosing
  • Sedimentation and clarification
  • Multimedia / sand filtration
  • Activated carbon adsorption
  • Manganese and iron (Mn/Fe) reduction
  • Sludge thickening and removal
  • Independent diesel power generation with standby redundancy
  • Pre-engineered steel weather-protection building (multi-span, designed to international steel codes)

Construction & commissioning timeline

  • Delivered as part of the second-cluster plants alongside Plant 2.2.
  • Construction and installation of a pre-engineered steel weather-protection shelter (October–November 2020).
  • Continuous O&M maintained through to project handover in 2021.

Quality & HSE

Delivery was governed by our QA/QC approach — inspection, testing, and documentation against the treated-water specification — and by HSE management covering site safety, environmental control, and regulatory compliance. Laboratory testing and monthly operating reports tracked performance throughout the operations period.

Engineering challenges solved

  • Protecting sensitive process equipment from the climate with a purpose-built steel shelter.
  • Holding the treated-water specification against a variable inlet load through controlled coagulant and polymer dosing.
  • Maintaining power availability on independent diesel generation across the cluster.
  • Coordinating structural fabrication and installation alongside ongoing plant operation.

Operations and maintenance were provided by SGS through to handover in 2021. The plant is no longer under our O&M; the experience, systems, and standards demonstrated here are directly transferable to our solar PV and civil infrastructure delivery.